Conserving Florida's Natural Heritage: Wetland Solutions, Sustainable Futures.
Services We Offer
-
Informal Wetland Determinations
An informal wetland determination is a preliminary assessment conducted to determine whether an area meets the criteria for being classified as a wetland. This assessment is based on field observations, soil analysis, and vegetation surveys. It is an important first step in land development projects, environmental impact assessments, and regulatory compliance processes. By identifying potential wetland areas early on, project planners can take appropriate measures to avoid or mitigate impacts on these sensitive ecosystems, thus ensuring sustainable development practices and compliance with environmental regulations. Informal wetland determination turn around time is 3-5 days, however may vary depending on current workload. Pricing is based upon parcel size.
Pricing:
0-0.99 Acres $325
1-2.99 Acres $380
3-4.99 Acres $500
5-6.99 Acres $620
7-8.99 Acres $780
9-9.99 Acres $900
10+ Acres - Request a proposal or call for more details
-
Wetland Permitting
If wetlands are identified on a property, environmental permitting will be required by local municipalities, the Florida Department of Environmental Protection (FDEP), the Water Management District (WMD) and or the United States Army Corps of Engineers (USACE) prior to development. We charge a flat permitting fee per parcel for single-family residential permit applications and a to be determined permitting fee for commercial and muti-family permit applications. Most permits are valid for 5 years and permits are easily transferable. In most cases, additional mitigation fee’s are required by state and federal agencies. The following are addressed during the permitting process:
Wetland/Upland Boundaries, Quantity & Quality
Environmental Site Plan
Mitigation
State and Federal Protected Species
Post Issuance Forms
Pricing:
Single Family Residential $3,920
Commercial/Multi-family - Request a proposal or call for more details
-
Upland Permitting
In instances where development is presumed to fall within a specified proximity outlined by your local municipality to a wetland area but will not impact onsite wetlands, a verification of exemption (VOE) will be required by local municipalities and the Florida Department of Environmental Protection (FDEP). We charge a flat fee for single-family VOE applications and a to be determined for commercial and multi-family VOE applications. The following are addressed during the VOE permitting process:
Wetland/Upland Boundaries
Environmental Site Plan
Pricing:
Single Family Residential $650
Commercial/Multi-family - Request a proposal or call for more details
-
Protected Species Surveys
In accordance with regulatory mandates, local, state, and federal agencies stipulate the necessity of protected species surveys, compliance with specific conditions, and the procurement of permits prior to the commencement of any land altering activities, particularly when suitable habitat or the presence of protected species are identified onsite. Our team comprises Florida Fish and Wildlife Conservation Commission (FWC) Authorized Gopher Tortoise Agents, Imperiled Beach Nesting Bird (IBNB) Monitors and experienced biologists who specialize in conducting these surveys. Pricing is dependent upon parcel size. The following species surveys are available:
Bald Eagle
Benthic/Seagrass
Burrowing Owl
General
Gopher Tortoise
Imperiled Beach Nesting Bird (IBNB)
Red-Cockaded Woodpecker (RCW)
Tree Survey
Pricing below is based on general listed species surveys only.
For more information on species specific survey’s, request a proposal or call for more details
0-0.99 Acres $450
1-2.99 Acres $625
3-4.99 Acres $775
5-6.99 Acres $900
7-9.99 Acres $1,125
10+ Acres - Request a proposal or call for more details
-
Compliance Resolution & Environmental Restoration
At Environmental Consultants of Florida we understand the sense of overwhelm when it comes to local, state and federal compliance issues because we have helped so many clients navigate and resolve them. We have excellent working relationships with these agencies and work to resolve the matter back into compliance with laws, regulations and guidelines in a timely, cost effective manner.
For more information, request a proposal or call for more details
-
Gopher Tortoise Permitting & Relocation
Gopher tortoises are state listed as threatened by the Florida Fish and Wildlife Conservation Commission (FWC). Both the gopher tortoise and their burrows are protected under state law. A relocation permit must be acquired from FWC before disturbing burrows and conducting construction activities. FWC defines disturbing burrows as any work that is conducted within 25’ of a gopher tortoise burrow. We have FWC experienced and approved authorized gopher tortoise agents on staff ready to aid you in gopher tortoise relocation efforts.
For more information, request a proposal or call for more details
-
Dock & Marina Permitting
In Florida, dock and marina permitting guidelines are regulated by various agencies including the Florida Department of Environmental Protection (FDEP), the United States Army Corps of Engineers (USACE), and local municipalities. Permitting typically involves assessing potential impacts on water quality, marine habitats, and navigation, as well as compliance with setback requirements and zoning regulations. Developers must submit detailed plans outlining the project's design, construction materials, and erosion control measures. Environmental assessments, including surveys for seagrass, mangroves, and protected species, are often required to ensure compliance with state and federal laws protecting coastal systems.
For more information, request a proposal or call for more details